Question: 1
A company receives their first MX7000 chassis. They connect all the provided power supply cables into two different PDUs on different power grids for redundancy. Each of the six power supplies is cabled and has green LEDs. One Management Module is present along with all system fans. Grid redundancy is configured as the power redundancy mode. The chassis is fully populated with six compute sleds and one IOM but only two of the six sleds will power on.
What is the possible reason for this issue?
Question: 2
What is a benefit of SmartFabric Services Mode?
Question: 3
What is the benefit of C22 power inlet connectors on the MX7000 chassis?
Question: 4
The iSM is available under which license(s)?
Question: 5
After installing a supported OS from a bootable ISO on an MX740c sled, an administrator discovers that not all the hardware is property detected by the OS. They plan to reinstall the OS.
What should the administrator do to resolve this issue through OS installation?